Santiago Creek Dam Improvement Project

Increasing water resiliency, enhancing safety, and improving efficiency

Aerial view of Irvine Lake and the Santiago Creek Dam

HISTORY OF THE DAM AND IRVINE LAKE

• Originally constructed in 1933, the Santiago Creek Dam forms Irvine Lake, which serves as a vital part of Orange County’s water infrastructure.

• While Irvine Lake provides recreational benefits to the county, its primary purpose is to store water for the benefit of surrounding communities.

• Irvine Lake is an important source of water for the Baker and Howiler treatment plants, which collectively provide water to 900,000 people throughout Central and Southern Orange County.

PROJECT OVERVIEW

Beginning in 2017, Irvine Ranch Water District undertook a comprehensive assessment of the 90 year-old Santiago Creek Dam. The assessment determined that the engineered earthen embankment dam is still operational but could be made safer. We also found that the outlet tower and spillway are reaching the end of their useful life and need to be replaced and upgraded to today’s seismic and safety standards.

Aerial view of the Santiago Creek Dam, spillway and outlet tower at Irvine Lake

The project will reconstruct the spillway and outlet tower, restore storage capacity in the reservoir, and strengthen the dam to meet today’s modern standards. The project is being designed using a Risk Informed Decision Making (RIDM) process that uses a rigorous, systematic, and thorough approach to dam safety that identifies and reduces risks. Incorporating RIDM into the project design goes above and beyond current standards required by the state and will result in a safer facility that will increase water reliability for decades to come.

Interested in learning more about dam safety? Watch the IRWD video: English | 中文字幕  | 한국어 자막

THE DETAILS

Three circular photos: the existing outlet tower in the lake, the spillway, and the earthen embankment dam

Replace the existing outlet tower that controls flow into and out of the reservoir, improve the regulation of flow, and bolster the seismic performance of the structure.

• The new outlet tower will be embedded in bedrock within the slope and include multiple intakes, creating increased efficiency and seismic stability.

Construct a new and safer spillway structure.

• Improvements will meet today’s seismic safety standards. View video: The importance of safety.

Strengthen the earthen embankment dam.

• Upgrade will further enhance safety.

TIMELINE

Project timeline: project start in 2020, design phase from 2020 to 2027, construction phase from 2027 to 2030, and project completion in 2030. Dates are as of 2024.

BENEFITS

View video: The benefits of this project

GET UPDATES

Sign up for updates on the project.

QUESTIONS?

Send an email to info@IRWD.com

DOCUMENTATION

Scoping Meeting presentation and flier (May 16, 2023)

Notice of Preparation and Scoping Meeting (May 16, 2023)

Initial Study (May 2023)

Draft EIR documentation will be available on IRWD.com on Monday, April 28, 2025.

ENVIRONMENTAL IMPACT REPORT

View video: The importance of environmental stewardship

Draft EIR – Executive Summary (April 2025)

Draft EIR – Notice of Availability (April 2025)

Draft EIR – Full Document (April 2025)